top of page
Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
Pillfold House
Located at Pillfold House in Vauxhall, this project involved replacing tired, rotting timber decking with a non-combustible, slip-resistant solution.
30mm Senior Flat Boards in textured silver grey were installed on a heavy-duty SupaJoist substructure, delivering strength, durability and a premium finish. The terrace wraps around three sides of the building, including a narrow alleyway and secluded rear terrace, where a Nosing Profile was used to neatly integrate the elevated section.

Get in Touch
Get the confidence, control, and compliance your project demands.
1st Floor, 3 Cumbrian House, 217 Marsh Wall, London, E14 9FJ
bottom of page


